resetWater Damage
Professional water damage drying equipment setup during structural drying

Water Damage Restoration Process

IICRC-Aligned Professional Standards

Reset Water Damage partner contractors follow IICRC S500 standards—the industry benchmark for professional water damage restoration. Here is what to expect from emergency call through complete restoration.

Category 1, 2, and 3 Water Classification

Our Step-by-Step Process

Active burst pipe flooding requiring emergency water damage dispatch
Step 1

Emergency contact and rapid dispatch

Thermal imaging inspection to map hidden moisture during damage assessment
Step 2

Inspection and water damage assessment

Saturated carpet and flooring from water intrusion before extraction
Step 3

Water removal and extraction

Removing wet baseboards and damaged materials during demolition phase
Step 4

Damaged material removal

Sewage cleanup and sanitization in progress after Category 3 water damage
Step 5

Cleaning, sanitizing, and deodorization

Commercial dehumidifier running during structural drying and dehumidification
Step 6

Structural drying and dehumidification

Moisture meter reading taken on basement wall during daily drying monitoring
Step 7

Daily moisture monitoring until dry standard reached

Restored basement bathroom after water damage mitigation and reconstruction
Step 8

Repairs and full restoration

Call (720) 727-1129

Frequently Asked Questions

What is the IICRC water damage restoration standard?

The IICRC S500 standard defines industry best practices for water damage restoration including categorization of water (Category 1, 2, 3), structural drying protocols, and documentation requirements for insurance.

How long does the full restoration process take?

Mitigation and drying typically take 3–7 days. Reconstruction depends on scope—from days for minor repairs to weeks for major rebuilds.

FAST HELP. REAL PEOPLE. REAL RESULTS. — TAP TO CALL